Changes Concerning the Target Control System Manaul: 16 November 2002 *Comment about the "PID enabled" in the heater screen added in section 4..3.2, as well as comment about new mode of operation for the PID w.r.t. beam on and LH2 target in beam. *The names of the most important MEDM screens are added in section 3.1.1. 21 October 2002 Include a few lines on the use of the laptop hallc1, as well as new information about range-settings in the targetmotion section. 20 September 2002 *Recent changes to g0-controls-manual.ps *The only major changes are for the motion controls sections in chapters 2 and 4. The manual now contains a much more comprehensive description of the motion controls. *Changes to the rest of the manual concerns mostly grammer or are of a cosmetical nature.