sms-osp: 9/18/02 - Standard procedures included - Emergency procedures included - Inspection and maintenance schedule included - Operating guidelines (wise words from Andy) included - Training requirements included - Safety equipment section updated 9/9/02 Updated screenshots of LookoutDirect Pages. 10/13/02 - Updated screenshots of LookoutDirect Pages. - Added new drawings and discussion of digital and analog quench protection - Made all changes that had already been made in the Cooldown TOSP to corresponding sections of the OSP - Added sections for safety equipment and instrument calibration - Added appendicies for alarm numbers and vessel/relief specs (the latter was removed from the in-line text). - Re-formatted the check lists to use "outline" numbering - Added numerous bookmarks and cross references - Various other little corrections and additions - Ran through the spell checker in MS Word Note: This version has been submitted as the final version prior to the start of the commissioning run. All "under construction" symbols have been removed. 10/24/02 - Updated to include corrections from reviewers (particularly Dave Kashy) - New DQP picture showing changes in September - LCW flow diagram added - Cartoons of different cooldown modes added - Photos of Magnet signs added (and text altered to match reality). - Corrected alarm numbering table for new alarms. 11/15/02 (DS) - The only real change is the correction of a formula on page 23. I also updated the draft number and revision date on the title page. 11/25/02 (SW) - Corrected the reference to the "flow sheet" in the references (see Me02) - Added Greg Smith as someone who can approve people in the appendix A lists and removed the the word "temporary" in the Appendix A intro paragraph (these changes were made in two places) - Changed draft number to 10 and revision date to 11/25/02.