A very productive day with many
different studies and some interesting results (more than 200 g0log entries
and the day is not over yet....).
Congratulations to the many who
contributed.
11/20 Owl Shift-
00:00-02:00 We checked the Front/Back coincidences
in FR electronics (Domi, Christophe). Was done with GENEX in September
02 but that does not take into
account differences in cable lengths and signal shape- 8338
- 8379
02:00-09:00 Neutral Axis studies: beam steering
in x and y using beam line magnetic optics 8373
. See below (Analysis) for the results
MCC told me at the 08:00 meeting that there would be some Hall B beam studies at 09:00 to be followed by some injector studies for G0 beam until 14:00. At 09:00 they had changed their mind and the beam studies were cancelled except for a short one (1h) in the injector around noon. So we cancelled the plan to ramp down the magnet for software work, which would have taken 3-4 hours. This will be scheduled firmly tomorrow whatever happens to the G0 beam studies planned by MCC between 10:00 and 13:00.
09:30-15:00 Lumi studies (Betsy). Some encoraging
results to be seen in 8443
. At lest 2 Lumi monitors seem to work fine (lucite and water Cerenkov)
and there are
more to come (bare PMT, quartz). Some more detailed studies will be done
tomorrow for 1-2h between 04:00 and 10:00 if the main program (Neutral
Axis)
allows it..
These were interleaved with HB paddle shielding studies (to
see if Pavel can reproduce the data) and NA YO delay studies (with
the present YO the pions are cut when the full_gain HV is used on the NA
detectors)
Analysis status
Look to the analysis of the first Neutral Axis
steering results by Kaz - 8481-8482
. This was horizontal steering. The data show nicely that the up/down counting
rate ratio is constant (Octant 1/Octant 3) and that the left/right ratio
exhibits a nice linear slope as it should.
The FR octants being all tilted, the data show a linear slope in 2/6
and 4/8.
This is a proof that the NA and FR octants are were we think they are
(in case someone had doubts :-)
General issues
Some very important issue: I learned this morning at the MCC meeting that the beam will be shut down Wed 27 Nov at 08:00 (am) for Thanksgiving. This is one day less than indicated in Steve Pate's schedule. The last 3 days are planned for empty target studies so the new schedule looks like this:
Sun 11/24 16:00 LH2 boil-off
Mon 11/25 09:00 Hall C access for
~2h: pump out H2 gas and fill with He gas
Mon 11/25 16:00 He cooled, tgt
ready for empty tgt runs (with FR and NA detectors ON) untl Tue 11/26 at
16:00
Tue 11/26 Swing Shift and Wed 11/27 Owl Shift ==> G0 Beam Studies (2 shifts)
That means that there will be no data taking starting already Tue 26/11 at 16:00. I looked at the program and I think that, barring any catastrophic event, we'll have completed the Neutral Axis studies and Shielding tests by that time. We might even have some time during the next week-end to take some long Asymmetry runs.
During target work-out, we can do Moeller measurements and take some
carbon
or empty target data. If you have any needs or ideas, please
send me a mail asap so that I can prepare a detailed schedule for these
2-3 days.