Document List by Topic
These documents on Collaborations matters
and sub-topics are available:
| G0-doc-# |
Title |
Author(s) |
Topic(s) |
Last Updated |
| 838-v2 |
Transverse Asymmetry Correction |
Juliette Mammei |
Polarization
General
Transverse
|
29 Sep 2009 |
| 682-v2 |
HallC users group meeting presentation, January 25th 2007 |
Fatiha Benmokhtar |
General
G0 Overview
Analysis
|
07 Sep 2007 |
| 701-v1 |
Transverse Asymmetry Results from the G0 Forward-Angle Measurement (Science and Technology Review Slides) |
Sarah K. Phillips |
General
Transverse
|
07 Sep 2007 |
| 683-v1 |
Parity Violation in Elastic Electron Scattering: A First Measurement of the Parity-Violating Asymmetry at Q2 = 0.631 GeV/c2 at Backward Angle
|
Stephanie Bailey |
General
Injector/Source
General
G0 Overview
Analysis
|
09 Mar 2007 |
| 671-v1 |
MEASUREMENT OF PARITY-VIOLATING ELECTROWEAK ASYMMETRIES IN e-p SCATTERING AT 0.1 < Q2 < 0.4 (GeV/c)2 |
Jeff Secrest |
General
G0 Overview
|
26 Jun 2006 |
| 650-v3 |
A Measurement of the Strange Quark Contributions to the Electromagnetic Form Factors of the Nucleon |
Jianglai Liu |
General
G0 Overview
Strange ff
|
05 Apr 2006 |
| 642-v2 |
G0 backward angle : PAC28 proposal |
The G0 collaboration |
General
Strange ff
PAC
|
15 Mar 2006 |
| 289-v3 |
Operational Safety Procedure (OSP) for the G0 Superconducting Magnet System |
Andy Kenyon et al. |
General
JLab Operation Documents
|
13 Mar 2006 |
| 619-v1 |
Thesis of Benoit Guillon |
Benoit Guillon |
General
General
G0 Overview
General
General
General
French
|
03 Mar 2006 |
| 558-v1 |
G0 slides presentation to PAC28 |
Douglas H. Beck |
PAC
|
16 Feb 2006 |
| 214-v1 |
PAC 20 Proposal (P-01-115) Measurement of the Parity Violating Asymmetry in the N->DELTA Transition (presentation transparencies) |
Tony A. Forest et al. |
N-Delta
PAC
|
16 Feb 2006 |
| 224-v1 |
The G0 Experiment, Backward Angle Measurements, A Proposal to PAC 20 (Transparencies) |
Douglas H. Beck |
Strange ff
PAC
|
16 Feb 2006 |
| 223-v1 |
The G0 Experiment, Progress Update to PAC 20 (Transparencies) |
Douglas H. Beck |
PAC
|
16 Feb 2006 |
| 179-v1 |
PAC Jeopardy Proposal: Measurement of the Parity Violating Asymmetry in the N->DELTA Transition (Originally E97-104) |
Tony A. Forest et al. |
N-Delta
PAC
|
16 Feb 2006 |
| 442-v1 |
Measuring the Two-photon Exchange Amplitude with Vector Analyzing Powers in Elastic Electron-proton Scattering (A Proposal to JLab PAC26) |
Paul M. King et al. |
Transverse
PAC
|
16 Feb 2006 |
| 441-v1 |
Measurement of the Parity Violating Asymmetry in the N->DELTA Transition (Originally E97-104) (PAC26 Jeopardy Proposal) |
Neven Simicevic et al. |
N-Delta
PAC
|
16 Feb 2006 |
| 601-v1 |
PAC29 talk : backward angle at Q2=0.23 (Gev/c)2 |
Douglas H. Beck |
General
Strange ff
PAC
|
09 Feb 2006 |
| 574-v1 |
Update for PR05-108 : G0 experiment backward angle measurement at Q2=0.23 GeV2 (proposal to PAC29) |
The G0 collaboration |
G0 Overview
PAC
|
06 Dec 2005 |
| 439-v1 |
Results from the G0 Engineering Runs (Answers to Questions) |
The G0 collaboration |
PAC
|
30 Nov 2005 |
| 570-v1 |
Contribution to NUPPAC'05 |
Louis Bimbot |
General
|
18 Nov 2005 |
| 553-v1 |
Parity Violating e-p Experiments: talk at the 2005 Gordon Conference on Nuclear Physics |
Elizabeth J. Beise |
General
G0 Overview
|
11 Nov 2005 |
| 25-v1 |
Measurement of the Parity Violating Asymmetry in the N -> DELTA Transition |
Kathleen Johnston et al. |
N-Delta
PAC
|
09 Nov 2005 |
| 522-v1 |
Letter to Larry Cardman Concerning G0 Plans for Back-angle Running |
The G0 collaboration et al. |
PAC
|
20 Dec 2004 |
| 504-v1 |
G0 Backward Angle: Jeopardy Review, A Presentation at the Jefferson Lab PAC26 |
Douglas H. Beck |
Strange ff
PAC
|
14 Jul 2004 |
| 440-v1 |
The G0 Experiment, Backward Angle Measurements Update (PAC26 Jeopardy Proposal) |
The G0 collaboration |
Strange ff
PAC
|
24 May 2004 |
| 481-v1 |
E00-006, The G0 Experiment: Measurement of the Neutral Weak Form Factors of the Nucleon, A Contribution to the 2003-2004 Jefferson Laboratory Physics Division Annual Report |
Douglas H. Beck et al. |
Strange ff
JLab Operation Documents
|
01 Feb 2004 |
| 431-v1 |
Experiment Safety Assesment Document (ESAD) for the Forward Angle Phase of the G0 Experiment (updated for 2003-2004 running) |
Julie Roche |
JLab Operation Documents
|
13 Nov 2003 |
| 432-v1 |
Conduct of Operations (COO) for Hall C Experiment E00-006 (updated for 2003-2004 running) |
Julie Roche et al. |
JLab Operation Documents
|
12 Nov 2003 |
| 433-v1 |
Information to Establish the Radiological Safety Analysis Document (RSAD) for G0 Running in Fall 2003 and Spring 2004 |
Julie Roche et al. |
Background
JLab Operation Documents
|
07 Oct 2003 |
| 406-v1 |
G0 Publications Guidelines |
Serge Kox et al. |
General
|
03 Sep 2003 |
| 375-v1 |
The G0 Experiment, All Systems G0, a Presentation at the 2003 Nuclear Physics Gordon Conference |
Mark L. Pitt |
General
G0 Overview
|
01 Jul 2003 |
| 371-v1 |
G0 Experiment Status: Commissioning Run, a Presentation at the Fourth International Conference on Perspectives in Hadronic Physics, Trieste, May 12-16, 2003 |
Guillaume Batigne |
Run plan
Strange ff
|
01 May 2003 |
| 373-v1 |
Status of the G0 Experiment, a Presentation at the APS 2003 April Meeting |
Silviu D. Covrig |
General
Strange ff
|
01 Apr 2003 |
| 329-v1 |
Status of the 2002 G0 Commissioning Run, A Presentation at the January 2003 Hall C Users Meeting |
Paul M. King |
Run plan
|
09 Jan 2003 |
| 284-v1 |
Experiment Safety Assesment Document (ESAD) for the Forward Angle Phase of the G0 Experiment |
Phil Roos et al. |
JLab Operation Documents
|
21 Oct 2002 |
| 242-v1 |
Conduct of Operations (COO) for Hall C Experiment E00-006 |
N. Chant et al. |
JLab Operation Documents
|
19 Sep 2002 |
| 320-v1 |
Radiological Safety Analysis Document (RSAD), Experiment E00-006 |
Allison Lung et al. |
JLab Operation Documents
|
20 Aug 2002 |
| 283-v1 |
Temporary Operational Safety Procedure (TOSP) for the Initial Cooldown of the G0 Superconducting Magnet System (Version 8) |
Paul Brindza et al. |
General
JLab Operation Documents
|
11 Aug 2002 |
| 285-v1 |
Temporary Operational Safety Procedure (TOSP) for the G0 Target Neon Test |
Silviu D. Covrig |
General
JLab Operation Documents
|
17 May 2002 |
| 287-v1 |
Temporary Operational Safety Procedure (TOSP) for the G0 Target Hydrogen "No Beam" Tests |
Silviu D. Covrig |
General
JLab Operation Documents
|
17 May 2002 |
| 261-v1 |
Temporary Operational Safety Procedure (TOSP) for the Evacuation of the G0 SMS Vacuum Vessel and Target Service Module |
Greg Smith et al. |
General
General
JLab Operation Documents
|
23 Apr 2002 |
| 257-v1 |
Memorandum of Understanding Between SURA/TJNAF and UIUC for Nuclear Physics Research on the G0 Experiment |
C. Leeman et al. |
Management
JLab Operation Documents
|
08 Apr 2002 |
| 256-v1 |
Conduct of Operations (COO) for Hall C Installations, Experiment G0 |
B. Clement |
JLab Operation Documents
|
29 Mar 2002 |
| 251-v1 |
Report on the G0 Target Safety and Technical Review |
J. Kilmer |
Review
General
|
11 Feb 2002 |
| 250-v1 |
Report to the G0 Cryotarget Safety Review Committee |
Kenneth Gustafsson |
Review
General
|
01 Feb 2002 |
| 244-v1 |
Report of the Second G0 Readiness Review |
David J. Mack et al. |
Review
|
14 Jan 2002 |
| 243-v1 |
Response to Issues and Concerns from Second G0 Readiness Review |
Allison Lung et al. |
Review
|
12 Jan 2002 |
| 218-v1 |
Report of the Second G0 Readiness Review |
David J. Mack |
Review
|
21 Sep 2001 |
| 235-v1 |
Temporary Operational Safety Procedure (TOSP) for the G0 Cryotarget Test in the JLab Test Lab |
Kenneth Gustafsson |
General
JLab Operation Documents
|
18 Jun 2001 |
| 215-v1 |
Transparencies from the DOE/NSF 2001 Progress Review talk of D. H. Beck |
Douglas H. Beck |
Review
|
01 Jun 2001 |
| 198-v1 |
Measurement of the Parity Violating Asymmetry in the N->DELTA Transition (Originally E97-104), a Proposal to PAC20 |
Steve Wells et al. |
N-Delta
PAC
|
01 Jun 2001 |
| 197-v1 |
The G0 Experiment, Backward Angle Measurements, a Proposal to PAC20 |
The G0 collaboration |
Strange ff
PAC
|
01 May 2001 |
| 232-v1 |
Temporary Operational Safety Procedure (TOSP) for the G0 Target Helium Circuit Pressure Test |
Greg Smith |
General
JLab Operation Documents
|
30 Mar 2001 |
| 164-v1 |
Report of the First G0 Readiness Review |
David J. Mack |
Review
|
13 Sep 2000 |
| 216-v1 |
G0 Readiness Review II |
The G0 collaboration |
Review
|
31 Aug 2000 |
| 159-v1 |
G0 Readiness Review I |
The G0 collaboration |
Review
|
14 Aug 2000 |
| 137-v1 |
Jefferson Lab Beam Request for G0 Commissioning |
The G0 collaboration |
JLab Operation Documents
|
29 Feb 2000 |
| 139-v1 |
Report of the January 26-28, 2000 Meeting of the Jefferson Lab Program Advisory Committee, PAC17 |
D. Geesaman |
PAC
|
01 Feb 2000 |
| 120-v1 |
The G0 Experiment, Forward Angle Measurements (Proposal to PAC17) |
The G0 collaboration |
Strange ff
PAC
|
13 Dec 1999 |
| 62-v1 |
PAC Jeopardy Proposal, The G0 Experiment (Originally E91-017) |
The G0 collaboration |
Strange ff
PAC
|
16 Dec 1998 |
| 59-v1 |
G0 Collaboration Governance |
The G0 collaboration |
Management
|
01 Nov 1998 |
| 6-v1 |
PAC update |
The G0 collaboration |
Strange ff
PAC
|
01 Dec 1993 |
| 5-v1 |
G0 Technical Design Report |
The G0 collaboration |
General
|
01 Nov 1993 |
| 185-v1 |
Letter to Larry Cardman Concerning Scheduling of G0 Commissioning |
Douglas H. Beck et al. |
PAC
|
00 Dec 0000 |
| 184-v1 |
Letter to the PAC19 Chairman Donald Geesaman and Larry Cardman Concerning G0 Plans for Back-angle Running |
Douglas H. Beck et al. |
PAC
|
00 Dec 0000 |
Number of documents found: 65
DocDB Version 8.6.0, contact
Document Database Administrators
Execution time: 3 wallclock secs ( 0.25 usr + 0.58 sys = 0.83 CPU)