Document List by Topic
These documents on Computing
and sub-topics are available:
| G0-doc-# |
Title |
Author(s) |
Topic(s) |
Last Updated |
| 829-v3 |
Final Q2 report |
Juliette Mammei |
Simulation
Other
|
01 Jul 2009 |
| 678-v3 |
G0 Electronics and Data Acquisition (Forward-Angle Measurements) |
Jacques Arvieux et al. |
DAQ
General
|
25 Mar 2008 |
| 682-v2 |
HallC users group meeting presentation, January 25th 2007 |
Fatiha Benmokhtar |
General
G0 Overview
Analysis
|
07 Sep 2007 |
| 683-v1 |
Parity Violation in Elastic Electron Scattering: A First Measurement of the Parity-Violating Asymmetry at Q2 = 0.631 GeV/c2 at Backward Angle
|
Stephanie Bailey |
General
Injector/Source
General
G0 Overview
Analysis
|
09 Mar 2007 |
| 619-v1 |
Thesis of Benoit Guillon |
Benoit Guillon |
General
General
G0 Overview
General
General
General
French
|
03 Mar 2006 |
| 573-v1 |
The Cryogenic Target for the G$^0$ Experiment at Jefferson Lab |
Elizabeth J. Beise et al. |
General
General
Slow Control
Analysis
|
05 Dec 2005 |
| 435-v1 |
Data Analysis of the First Commissioning of the G0 Experiment, a Presentation at the APS/DNP Fall 2003 Meeting, October 30 - November 1, 2003, Tucson, Arizona |
Jianglai Liu et al. |
Strange ff
Analysis
|
08 Nov 2005 |
| 523-v1 |
Analysis Update of the G0 Forward Angle Run, A Presentation at the 2005 Jefferson Lab Hall C Winter Workshop |
Jianglai Liu |
Analysis
|
08 Nov 2005 |
| 525-v1 |
Asymmetries Analysis from the Forward Angle Part of the G0 Experiment, A contribution to the Proceedings of the 16th International Spin Physics Symposium (SPIN2004) Trieste (Italy), October 10-16, 2004. |
Julie Roche |
Analysis
|
08 Nov 2005 |
| 471-v1 |
Background Subtraction in Parity Violation Experiments, A Presentation at the International Workshop on Parity Violation and Hadronic Structure (PAVI/2004), Grenoble, June, 2004 |
Jacques van de Wiele |
Analysis
|
09 Jun 2004 |
| 438-v1 |
Contribution a l'experience G0 de violation de parite; calcul et simulation des corrections radiatives et etude du bruit de fond |
Hayko Guler |
Simulation
Strange ff
|
17 Dec 2003 |
| 331-v1 |
Requirements for Beam-Synched Signals for G0 |
Brian Quinn et al. |
General
DAQ
General
|
14 Mar 2003 |
| 326-v1 |
Electronics and Data Acquisition for G0 (Forward-angle Measurements), Proceedings of the PAVI/2002 Conference, Mainz, June 2002 |
Dominique Marchand et al. |
DAQ
General
|
03 Jun 2002 |
| 327-v1 |
G0 Electronics and Data Acquisition, A Presentation at the PAVI/2002 Conference, Mainz, June 2002 |
Dominique Marchand et al. |
DAQ
General
|
03 Jun 2002 |
| 316-v1 |
Specifications of a Beam-Synched Time Reference Device for the G0 Experiment |
Mark L. Pitt et al. |
General
DAQ
General
|
16 Feb 2002 |
| 85-v1 |
Specifications for EPICS-based Controls Software for the G0 Target |
Elizabeth J. Beise |
General
Slow Control
|
26 Feb 1999 |
Number of documents found: 16
DocDB Version 8.6.0, contact
Document Database Administrators
Execution time: 3 wallclock secs ( 0.24 usr + 0.64 sys = 0.88 CPU)